A manufacturer of industrial equipment came to Shenzhen Metal Parts, Inc. for production of a front loader assembly that would be part of an industrial conduit pipe bender. Our in-house tooling expertise enabled us to create the necessary welding and assembly fixtures and gages. Made from hot-rolled sheet steel, this assembly was fabricated using our CNC processes of punching, bending, milling, and turning. Pieces were assembled with MIG welding and the finished product measured 30" x 26" x 22". To apply the electrostatic finish, we worked with our painting vendor to reverse engineer the finish to determine the paint and the finish materials. We maintained tight manufacturing tolerances throughout each production step. This 65 lb. part was fully inspected to meet our high quality standards.
To learn more about this project, including tolerances and inspection processes, please contact us today or see the table below.
Contact: Mr. Yao
Email: inquiry@winnewtech.com
Phone: +86-18938049948
Tel: + 86-(755)-81498498
Add: NO.1,QiluThreeRoad,Shangnan Industry,Shajing Baoan District,Shenzhen City,Guangdong Province,China